Monday 26th October 2020

Students Visit New Site

On Friday 27th September, a selection of students were given the opportunity to visit the site of our new college and see the construction up close.

Contractors from Willmott Dixon were at hand to welcome the students and take them through several safety precautions before taking them onto the site.

The students were taken around the framework of the new building, then taken up onto the various floors for a closer look. They were completely overwhelmed by the sheer size of our new college building.

COLLEGE MAGAZINE

  • College Magazine Summer 2015
  • College Magazine Autumn 2014
  • College Magazine Spring 2014
  • College Magazine Winter 2013
  • College Magazine Summer 2013
  • College Magazine Winter 2012
  • College Magazine Summer 2012
  • College Magazine Winter 2011
  • College Magazine Summer 2011
  • College Magazine Winter 2010
  • College Magazine Summer 2010
  • College Magazine Winter 2009